Serving Your Compliance Needs

JSC Offers all aspects of RMP and PSM Compliance Services to ensure you are in compliance with OSHA 1910.119 and EPA 40 CFR Part 68, GDC and State Regulations.

At JS Compliance engineering precision meets industry-leading expertise. Our dedicated team of professionals are committed to providing comprehensive Compliance Services tailored to meet the complex demands of your projects. With a focus on efficiency, reliability, and compliance, we offer a suite of specialized services designed to optimize your operations and ensure your program exceeds industry standards.

Mechanical Integrity Inspections

Example of findings we find most often when performing Mechanical Integrity Inspections

 
  • IIAR-6 Annual and Five-Year Mechanical Integrity Inspections
  • IIAR-9 System Safety Assessments
  • Preventive Maintenance Program and Procedures
  • Non-Destructive Testing Programs
  • Safety System Testing Verification (Compressor Cutouts, E-Stops, High Level in Vessels, Ventilation Systems Operations)
  • Valve Tagging
  • Equipment and Pipe Labeling 
 

Risk Management Plan Programs

  • Development and Preparation for RMP Submittals to the EPA
  • Hazard assessment (Worse-Case and Alternative Case Scenarios)
  • Emergency Response Programs
  • HAZMAT Training (Initial and Refresher Training)
  • Formal Root Cause Analyss Incident Investigation and RMP Reportable Accident
  • Third-party compliance Audits after and RMP Reportable Accident
  • Employee Participation Training 
  • Stop Work Procedures
  • Emergency Response Exercises
  • Update Process Safety Information 
  • RAGAGEP Review 

Process Safety Management Program Development

  • Written PSM Program for new and existing facilities
  • Written ARM (Ammonia Refrigeration Management) Program Development 
  • Written General Duty Clause Program (PSM Lite or ARM)
  • Initial and Five-Year (PHA) Process Hazard Analysis Facilitation 
  • Operating Procedures Development and Updates
  • Safe Work Practice Procedure Development (LOTO, Line Break, Hot Work, Confined Space)
  • Training Program Development

Engineering Services

  • Piping and Instrumentation Diagram Development and Updates (P&ID’s) 
  • AutoCAD Drawings
  • Block Flow Diagrams
  • Relief Vent System Design Calculations
  • Maximum Intended Inventory (Ammonia Charge) Calculations
  • Material and Energy Balances (systems built after 1992)
  • Ventilation System Design Calculations 
  • RAGAGEP
 
PID photo
IMG_2127

Auditing

  • Expert Witness
  • RMP Plan Auditing 
  • Three-Year PSM Compliance Audits
  • GAP Assessments
  • ARM Program Auditing
  • General Duty Clause – PSM Lite Auditing
  • EPA and OSHA Inspection Representation 
    •